0 $0.00
items in your cartto quote Checkout
Ooops no items were found.
Try something else.
Ok
Loading…

TAPE LONG LEADER 3/8""X50

Category Measuring Tapes
LFKHC253N
Call for price
Starting from
$79.77 / EA
/
LIST PRICE $79.77
%
- +
Compare

TAPE LONG LEADER 3/8""X50

Item Code: LFKHC253N
Crescent® Tape Measure, Series: Leader®, Measuring System: Imperial, 50 ft Blade Length, 3/8" Blade Width, Steel Blade, Graduations: Graduated Feet and Inches to 1/8ths with Instantaneous Readings, 16 Inch Centers Indicated by a Diamond Symbol, Black on One Side Markings, Crank Rewind, Non-Locking Locking, Folding Hook Ring Hook, Vinyl Covered Steel Case, Black Case
Category Measuring Tapes

Specifications

Made In

MX

Weight

0.93lb

Brand

LUFKIN BY CRESCENT

Category

Measuring Tapes

Crescent® Tape Measure, Series: Leader®, Measuring System: Imperial, 50 ft Blade Length, 3/8" Blade Width, Steel Blade, Graduations: Graduated Feet and Inches to 1/8ths with Instantaneous Readings, 16 Inch Centers Indicated by a Diamond Symbol, Black on One Side Markings, Crank Rewind, Non-Locking Locking, Folding Hook Ring Hook, Vinyl Covered Steel Case, Black Case

Trusted by the top manufacturers for over 113 years!

Specifications

Made In

MX

Weight

0.93lb

Brand

LUFKIN BY CRESCENT

Category

Measuring Tapes

Crescent® Tape Measure, Series: Leader®, Measuring System: Imperial, 50 ft Blade Length, 3/8" Blade Width, Steel Blade, Graduations: Graduated Feet and Inches to 1/8ths with Instantaneous Readings, 16 Inch Centers Indicated by a Diamond Symbol, Black on One Side Markings, Crank Rewind, Non-Locking Locking, Folding Hook Ring Hook, Vinyl Covered Steel Case, Black Case

Trusted by the top manufacturers for over 113 years!

SEARCH ×